[1]
Zegeye, Y.G. and Darsa, M.H. 2024. Potential risk factors affecting cost and schedule performance in the case of construction projects in Dire Dawa city administration and Harari region, Ethiopia. Building Engineering. 3, 1 (Nov. 2024), 1509. DOI:https://doi.org/10.59400/be1509.